What was involved in this project?
This project involved the ground excavation, foundations and construction of a below ground level bunker build to house a train set for our client in Devon.
First, we carried out the digger work to excavate a large amount of soil before digging and filling new foundations for the bunked. The surrounding ground was braced and then block wall construction began.
We then completed all wall work inside the bunker, including bracing, insulation, plasterboarding and plastering. The outside finishes for the walls and steps were then completed, leaving an attractive bunker.
Project cost
£-
Location
Devon
Services required
Project gallery